Posted: Saturday December 9, 2017

IA Stage recently completed at courtesy inspection at Tampa Preparatory School. Tampa Prep’s 3,000+ sqft grid was installed in the Smith Black Box Theatre in 2002. After 14 years supporting a busy 6th – 12th grade performance schedule, the grid still looks pristine.

Tampa Preparatory Exterior

Tampa Prep Outdoor Shot

SkyDeck™ at Tampa Prep

The school was recognized as an Apple Distinguished School for innovation, leadership, and educational excellence twice in the 2016-2018 school year.

Back to all news